CASE STUDY : CHRISTCHURCH BRIDGE LIFT DECEMBER 2013

CHRISTCHURCH BRIDGE LIFT HERALDS NEW DAWN FOR HTC TECHNOLOGY IN INFRASTRUCTURE When South New Brighton’s Bridge Street bridge was lifted in a sub-24-hour operation between 13 and 15 December 2013, it was the first time a maneuver of its type and technological complexity had been performed in New Zealand or Australia. The raising of buildings … Continue reading CASE STUDY : CHRISTCHURCH BRIDGE LIFT DECEMBER 2013