Your Name (required)

Your Email (required)

Subject

Location

Your Message

For a quote on using this system please call 0800 48 2000|info@htc.co.nz

CASE STUDY : CHRISTCHURCH BRIDGE LIFT DECEMBER 2013

CHRISTCHURCH BRIDGE LIFT HERALDS NEW DAWN FOR HTC TECHNOLOGY IN INFRASTRUCTURE

When South New Brighton’s Bridge Street bridge was lifted in a sub-24-hour operation between 13 and 15 December 2013, it was the first time a maneuver of its type and technological complexity had been performed in New Zealand or Australia.

The raising of buildings and other […]

By |November 5th, 2017|Case Studies|0 Comments

CASE STUDY : CHRISTCHURCH TOWNHOUSES

A SOLUTION FINDING INTERESTING PROBLEMS

HTC’s million dollar plus investment in the DURAPAC SYNCMASTER Syncronous Lifting System was prompted by the need for a sophisticated lifting solution to aid in the repair of earthquake damaged infrastructure in Christchurch and to revolutionise the way structures are lifted in New Zealand.

Following its initial use in a SCIRT/Fulton Hogan […]

By |November 5th, 2017|Case Studies|0 Comments